|
Align, the joint venture between Bouygues Travaux Publics, a subsidiary of Bouygues Construction, Sir Robert McAlpine, and VolkerFitzpatrick, a subsidiary of VolkerWessels that is delivering the Central 1 portion of HS2 Phase One, has chosen a next generation procurement delivery solution which can result in up to 70% reduction in carbon emissions previously caused by
Continue reading ALIGN JV CHOOSES UNIQUE ONSITE PROCUREMENT SOLUTION TO SUPPORT HS2 CONSTRUCTION
Andy Burnham, the Mayor of Greater Manchester, has responded to the government’s confirmation that the HS2 high-speed rail link will be built, the first phase between London and Birmingham with a second phase going onto Manchester and Leeds.
Mr Burnham said: “The Prime Minister has today listened and gone a considerable distance towards the case
Continue reading Mayor of Greater Manchester reacts to HS2 announcement
Rail College proposed site
An artist impression of the potential HS2 rail college on the site at Lakeside – created by Bond Bryan Architects
The location of the potential HS2 rail college in Doncaster has been revealed.
The 5.1 acre site at Doncaster’s Lakeside, would see the campus located close to
Continue reading Site for Doncaster’s potential HS2 rail college revealed
|
NEED AN UP TO DATE DATABASE?
|
Recent Comments